THE USEFUL IDEA

Draw an observed route, measure its segments and test one move with comparable orders. Keep the quality checks and steps the work still requires.

Choose what you will follow

The spaghetti diagram described by the Lean Management Institute shows the route of a product between stages. Here we will follow the person preparing an order. If the product stays on the table while someone fetches a box, the person’s route includes that trip.

Mark where preparation begins and where the finished order is left. Draw the table, shelf, printer and exit. Include any aisle or obstacle that forces a detour.

Trace one actual loop

Imagine the person starts at table A. They walk 3 m to shelf B and return with a box, then repeat the trip for a divider. They walk to printer C, 4 m from A, and return to attach the label. Finally they take the finished order to D, 2 m from the table.

Number each segment and record its direction. Two round trips to the shelf add up to 12 m. The printer adds 8 m and the handoff adds 2 m. The full example route is 22 m.

Test a location before making it permanent

Put a temporary tray for dividers half a meter from the table. Keep shelf B for boxes. For the same order, the divider trip would fall from 6 m to 1 m and the predicted total to 17 m. Draw the new route in a different color.

The tray needs replenishment. Record that trip separately and check that the tray stays out of the aisle and keeps different part references separate.

Repeat with a comparable unit

Try orders that use the same box and one divider. Measure the route and check for correct parts and crossings with other people. If someone is already carrying two orders together, record that condition. Distance per order depends on which trips it shares.

Keep the drawing and decision

Save the date, route boundaries, distances and what you moved. Compare packing travel alongside tray replenishment. If distance falls and a material error appears, review identification before making the tray permanent.

SOURCES & EDITORIAL NOTES

Follow the evidence.

  1. Lean Management Institute · Spaghetti Diagram ↗
  2. Lean Management Institute · Material Flow ↗

Sources checked November 10, 2026. The exercise scenarios and figures are fictional. Our editorial standards.

Good ideas are better when they travel.