Compare documents for the same purchase and unit. Retain partial receipts, discrepancies and owners; matching quantities replaces neither authorization nor other checks.
Collect three different references
An order records what was requested under a version; a receipt records what was documented as received; an invoice states the supplier’s charge. Find linking references alongside supplier, date, item and unit.
Oracle describes comparing order, receipt and invoice quantities in three-way matching with configured tolerances. We use that distinction as context for a manual exercise, without implementing its system or copying approval rules to every business.
Check what each quantity represents
A box and an item are not equivalent without a checked conversion. A line can also contain several models, a substitution or a differently packaged batch. Confirm the same object is being described before subtracting.
Retain accepted order versions and each delivery record. If the agreement changed from twelve items to ten, find its confirmation rather than overwriting the initial order to make numbers match. The stocks guide complements units and cutoffs.
Reconstruct a partial delivery
| Document | Quantity in items | Example reference |
|---|---|---|
| Order P-01 | 12 | Agreed version |
| Receipt R-01 | 10 | Delivery recorded through cutoff |
| Invoice F-01 | 12 | Charge awaiting review |
Order quantity exceeds recorded receipt by 12 − 10 = 2 items. The invoice also exceeds that receipt by two. This is the same gap in two comparisons, rather than four missing items to add together.
The case excludes other receipts, returns and adjustments. It establishes no supplier mistake: records or conditions might need clarification. “Quantity received” does not certify that every item passed quality inspection either.
Investigate without inventing a tolerance
- Confirm all deliveries for that order were included.
- Review cutoffs, units and line references.
- Check substitutions, returns and agreed changes.
- Compare price and other conditions separately.
- Assign discrepancy clarification and its required evidence.
Do not copy another system’s tolerance percentage or approve payment by rounding. Actual procedures govern receipt, acceptance and approval. If you cannot resolve the issue, retain it and escalate to its owner.
Close a gap with its reference
If another two-item delivery arrives, add its record and compare at the new cutoff. Keep what a supplier correction replaces. A shipping promise alone leaves those two items awaiting checked receipt.
Write a concrete result: “R-02 added two items; accumulated recorded quantity now matches twelve.” This proves no payment and authorizes no accounting changes. Invoice aging examines customer balances, a different review.
Leave a case someone else can continue
Retain order and version, receipts, invoice, observed discrepancies, supported explanation, owner and state. Share only necessary material through authorized channels. One reference sheet can be more useful than several unrelated attachments.
The reorder point prepares future purchasing review; this case follows an existing order. Its result is a reconstructable comparison, rather than guaranteed availability, accounting accuracy or payment approval.
Follow the evidence.
Sources checked October 27, 2026. Illustrative scenarios and numbers are fictional. The records and exercises are original editorial proposals, without attributed customer results or provider tests. Our editorial standards.